Restaurant slab and foundations on a live retail site
Footings, frost walls, column piers and the building slab for a Swiss Chalet in Saint John, placed and finished on a working retail lot through summer 2026.






A build pad carved out of an operating retail development — traffic, parking and neighbouring stores live on every side of the pour.
- 01 — What was asked for
A Swiss Chalet location in Saint John needed its structural concrete package on a pad inside a working retail development: strip footings, frost walls, column piers and the building slab.
- 02 — What we did
Footings and frost walls were formed and tied in trench, with column piers formed off the same run. The slab went in as a boom-pump placement and was floated and finished the same day.
- Footings, frost walls and column piers formed in one sequence
- Slab placed by boom pump and power-floated the same day
- Work run inside an operating retail site
- 03 — How it finished
Work is underway as of August 2026. This page will carry the finished numbers — volume, programme and handover — when the package closes out.
Other concrete jobs

Shop foundation and footings with a 35 m³ single pour
Footings and five-foot foundation walls for a 7,200 sq ft ServiceMaster shop — 48 m³ total with a 35 m³ single pour, done by a five-person crew.
Read the case study
Footings and foundation walls for an 18-unit block
Approximately 230 m³ of 25 MPa concrete placed in nine-foot walls on strip footings for an 18-unit residential development in Saint John, run by a four-person crew.
Read the case study
Twelve-foot walls for employee housing at St. Andrews
Concrete-only package for an employee apartment building at St. Andrews — 120 m³ placed in twelve-foot walls by a six-person crew, complete in September 2025.