Footings and foundation walls for an 18-unit block
Approximately 230 m³ of 25 MPa concrete placed in nine-foot walls on strip footings for an 18-unit residential development in Saint John, run by a four-person crew.



An infill lot in an established Saint John neighbourhood, with occupied houses hard against the property line on three sides.
- 01 — What was asked for
An 18-unit residential development needed its structural concrete package: strip footings and nine-foot foundation walls, on an infill lot with occupied houses close on three sides.
- 02 — What we did
A four-person crew formed and placed approximately 230 m³ of 25 MPa concrete in nine-foot walls. Placement ran off a boom pump reaching across the footprint from the street side.
- Four-person crew on the whole structural concrete scope
- Boom-pump placement from the street frontage
- Nine-foot walls formed, poured and stripped
- 03 — How it finished
Structural concrete complete in late September 2025, walls stripped and backfilled ready for the next trade.
Other concrete jobs

Shop foundation and footings with a 35 m³ single pour
Footings and five-foot foundation walls for a 7,200 sq ft ServiceMaster shop — 48 m³ total with a 35 m³ single pour, done by a five-person crew.
Read the case study
Twelve-foot walls for employee housing at St. Andrews
Concrete-only package for an employee apartment building at St. Andrews — 120 m³ placed in twelve-foot walls by a six-person crew, complete in September 2025.
Read the case study
Workshop foundation poured through a New Brunswick January
155 m³ of 25 MPa concrete in seven-foot walls for a 6,500 sq ft workshop, formed and placed in winter conditions and finished in January 2025.
Read the case studyLet’s have a chat about your project