Commercial concrete · Anywhere in New Brunswick
WorkSafeNB registered506 206 9636
CAMBRIDGE CONCRETECONCRETE ACROSS NEW BRUNSWICK
Commercial & industrial slabs

Commercial and industrial slabs across New Brunswick.

Warehouse, distribution, manufacturing, retail and storage floors anywhere in the province. Priced off drawings, placed in the largest continuous pours the site allows, and finished to what the spec calls for.

Swiss Chalet, Saint John — power-floating the building slab
  • On site sinceAugust 2026
  • ScopeCommercial & industrial slabs
The scope

What a slab package from Cambridge Concrete covers

Slab-on-grade for commercial and industrial buildings: sub-base preparation checked and signed off, vapour barrier where specified, reinforcement placed and supported, concrete placed and finished, joints cut on a published layout, and the floor cured to the method the spec names.

We bid as a subcontractor. The GC holds the schedule; we hold the pour and tell you the day the floor is available to the trade behind us.

  • Placed by pump, chute, line pump or crane bucket
  • Placement sequenced to the largest continuous pour the site and supply will carry
  • Saw-cut joints on a layout issued before the pour, not decided on the day
  • Cold-weather placement where the schedule requires it
Finished slab surface with the retail development beyond
Swiss Chalet, Saint John — the finished floor, power-trowelled and cut
Capability snapshot

What we can put on the ground

The numbers we work to on a job like this one.

Crew size
6
On every pour
Largest continuous pour
90m³
In a single day
Foundation walls up to
16ft
ICF or conventionally formed
Placing season
MAR–DEC
Cold-weather placement available
Trade scope

What’s included, and what isn’t

What sits inside our number, and what does not. We scope our projects as comprehensively as we can up front, and it is how we have built a reputation for budgets that hold from bid through handover.

Included in our number
  • Concrete and materials, turnkey
  • Placement and finishing labour
  • Reinforcement placement
  • Joint cutting to the issued layout
  • Curing to the specified method
By others
  • Excavation
  • Permits
  • Sub-base supply and compaction
  • Testing and inspection
  • Sealing and coatings
Slabs

Let’s talk about your slab and we’ll come back with a price

Drawings, square footage and a bid date is enough to get started.

Invite Us to Bid