Shop foundation and footings with a 35 m³ single pour
Footings and five-foot foundation walls for a 7,200 sq ft ServiceMaster shop — 48 m³ total with a 35 m³ single pour, done by a five-person crew.




The largest placement, 35 m³ of the 48, had to go in as one pour.
- 01 — What was asked for
A 7,200 square foot ServiceMaster shop needed its structural concrete: footings, five-foot foundation walls and the column pads for the building frame.
- 02 — What we did
A five-person crew formed and placed 48 m³ of 25 MPa concrete. The main wall run went in as a single 35 m³ placement rather than being broken into sections, with column pads formed and tied alongside.
- 35 m³ of the 48 placed in one continuous pour
- Five-person crew across the full scope
- Footings, five-foot walls and column pads in one package
- 03 — How it finished
Foundation and footings complete in July 2026.
Other concrete jobs

Footings and foundation walls for an 18-unit block
Approximately 230 m³ of 25 MPa concrete placed in nine-foot walls on strip footings for an 18-unit residential development in Saint John, run by a four-person crew.
Read the case study
Twelve-foot walls for employee housing at St. Andrews
Concrete-only package for an employee apartment building at St. Andrews — 120 m³ placed in twelve-foot walls by a six-person crew, complete in September 2025.
Read the case study
Workshop foundation poured through a New Brunswick January
155 m³ of 25 MPa concrete in seven-foot walls for a 6,500 sq ft workshop, formed and placed in winter conditions and finished in January 2025.
Read the case studyLet’s have a chat about your project
Send the drawings and we’ll come back with a number.