Cabin foundation on a wooded Grand Lake lot
Eight-foot foundation walls for a 720 sq ft cabin at Grand Lake — 20 m³ placed on a tight, treed lot in July 2025.


A small footprint on a treed lot with only the cut-in for access — everything had to work off the one opening.
- 01 — What was asked for
A 720 square foot cabin at Grand Lake needed its foundation: footings and eight-foot walls, on a lot cut into standing woods.
- 02 — What we did
The crew set out and poured the footings, then formed and placed eight-foot walls — 20 m³ in total — working off the single cleared access.
- Footings set out and poured on a tight cut-in lot
- Eight-foot walls formed and placed
- 20 m³ total on a 720 sq ft footprint
- 03 — How it finished
Foundation complete July 2025.
Other concrete jobs

Footings, walls and slab for a spec house in the woods
Footings, foundation walls and slab for a spec house at Durham Bridge — 40 m³ placed by a five-person crew.
Read the case study
On site nowRestaurant slab and foundations on a live retail site
Footings, frost walls, column piers and the building slab for a Swiss Chalet in Saint John, placed and finished on a working retail lot through summer 2026.
Read the case study
Shop foundation and footings with a 35 m³ single pour
Footings and five-foot foundation walls for a 7,200 sq ft ServiceMaster shop — 48 m³ total with a 35 m³ single pour, done by a five-person crew.
Read the case studyLet’s have a chat about your project
Send the drawings and we’ll come back with a number.