Footings, walls and slab for a spec house in the woods
Footings, foundation walls and slab for a spec house at Durham Bridge — 40 m³ placed by a five-person crew.





A cut-in lot in the woods, and a spec build where the whole concrete package came from one crew.
- 01 — What was asked for
A builder needed the full concrete package for a spec house at Durham Bridge — footings, foundation walls and slab — on a wooded lot cut in for the build.
- 02 — What we did
A five-person crew placed 40 m³ in total. Footings and walls were formed, poured and stripped, and the slab followed as a single pour.
- Foundation formed, poured and stripped
- Slab placed and finished in a single pour
- Five-person crew on the whole package
- 03 — How it finished
Complete in May 2025.
Other concrete jobs

Cabin foundation on a wooded Grand Lake lot
Eight-foot foundation walls for a 720 sq ft cabin at Grand Lake — 20 m³ placed on a tight, treed lot in July 2025.
Read the case study
On site nowRestaurant slab and foundations on a live retail site
Footings, frost walls, column piers and the building slab for a Swiss Chalet in Saint John, placed and finished on a working retail lot through summer 2026.
Read the case study
Shop foundation and footings with a 35 m³ single pour
Footings and five-foot foundation walls for a 7,200 sq ft ServiceMaster shop — 48 m³ total with a 35 m³ single pour, done by a five-person crew.
Read the case studyLet’s have a chat about your project